10 to12 Months
3 to 4 Months
2 to 4 Months
4 to 6 Months
Pre-Construction
Phase
Feasibility Analysis
Schematic Design
Detail Design
Contract Package
Feasibility Analysis
- Site Acquisition Due Diligence
- Site Acquisition Analysis
- Zoning Study
- Concept/Program
- Feasibility Analysis
- Physical:
- Environmental Site Assessment
- Soil Investigation
- Investigate Development Options
- Preliminary Cost Estimate
- Prepare Financial Model
- Conduct Land Value Analysis
- Negotiation
- Site Acquisition
- Conduct Development Options Analysis
- Construction Procurement Options Analysis
- Design-Bid-Build/G.C.
- Construction Manager/Guaranteed Maximum Price (C.M./G.M.P.)
- Design-Build
- Other
- Explore Deal Structuring
- Form Special Purpose Vehicle
- Solicit Investors
- Appoint Lead Consultant (Architect - depends on outcome of the Procurement Analysis)
- Issue LOI to C.M.( or Design Builder depending on outcome of the Procurement Analysis)
- Commence Zoning Change Application (If Reqd.)
Schematic Design
- Positioning on Site
- Massing Studies
- Basic Building Statistics - Space Analysis
- Structural System Selection
- Foundation Studies
- Curtain Wall Studies
- Utility Services Load Letters (Electricity, Water, Sewage, Telecom)
- MEP - Schematics
- Outline Specs - Architecural & Civil Works
- Outline Specs - MEP
- Schematic Estimates, Value Engineering (V/E)
- Preliminary Schedule
- Preliminary Approval
- Start RFI Process
- Demolition/Abatement Permits
- Demolition and Abatement
- Write & Finalize Contracts: CM
- Write & Finalize Contracts: A/E
Detail Design
- Fixed Geometry
- Floor Plans
- Structural Plans
- Foundation Design
- Column Schedule
- Typical Slab Details
- MEP Plans
- Specifications - A/S/MEP
- Curtain Wall Selection
- Building Selection
- Vertical Transportation
- Prelim. Finish Schedule
- Egress/core Plans
- Initial Building Dept. Filing
- D/D Estimates + Final V/E
- Site Logistics (CM or CM/GMP)
- On-going Construction Scheduling
- Pre-purchase Bid Packages
- Curtain Wall
- Excavation and Foundation
- Elevators
- Structural Steel
- Pre-cast Concrete
- MEP Equipment Schedule
- U/G Plumbing/Electric
- Excavation and Foundation Permit
Contract Package
- Complete All A/S/MEP Drawings
- Organize in to Bid Packages
- Final Specifications
- Building Dept. & other Approvals
- Finish Selection
- Finish Schedules
- CD Estimate
- Final Construction Schedule
- Alternates and Allowances
- Write & Redact Scope Riders
- Bid & Award Prebuy trades
- Pre-Buy V/E (As Applicable)
- Order Materials
- Start Shop Drawings
- Material Samples/Mock-ups
- Curtain Wall Testing
- Mobilize Site
- Start Excavation & Foundations
- Start Site Utilities
3 to 4 Months
18 to 36 Months
4 to 6 Months
12 Months
Pre-Construction
Phase
Construction
Phase
Post Construction
Phase
Tender & Award
Construction
Project
Close-out
Defects Liability
Tender & Award
-
Bid/Award G.C.
-
Bid/Award Trades
-
OR: Negotiate GMP
-
Sub Bidders Allowances
-
Alternates & Allowances
-
"Last Licks" V/E
-
Final Drawings Update
-
"OR Equal" Evaluation
-
Sub Contracts & Purchase Order
Construction
- Mobilization & Logistics
- Insurance and Bonding
- Permits & Other Filings
- Site Safety Plan
- Perimeter Fence & SOE
- Haz Mat Remediation and Demolitions
- Requisitions for Payment
- Cost Reporting
- Shop Drawings, Submittals & Bulletins
- Schedule Updates and Tracking
- Inter-Trade Co-ordination and BIM
- Start Excav and Foundations
- Superstructure w/Hooks
- Curtain Wall
- Site Utilities
- Roof & Sealants
- Vertical Transportation
- Core & Shell - Rough
- Core & Shell - Finishes
- Interior/Tenant Rough
- Interior/Tenant Finishes
- MEP Rough
- MEP Equipment and Distribution
- MEP Flush, Tests and Balance, Start-up
- Sitework & Landscaping
- Snag List
- Inspection/Sign-offs
- Clean-up and Demobilisation
- Change orders and claims
Close-out
- TCO/PCO/Sign-offs
- Final Snag List
- "As-built" Drawings
- "W.G. & Spare Parts"
- Claims And Extras
- Substantial Completion
- Final Completion
- Commissioning
- Maintenance Contracts
- Final Sub Close-outs
- Final Releases
- Final Payment
- W/G Comebacks
- Final Cleaning
- Demobilisation
- Archiving Records
- "Lessons Learned"